Malaysian Client Conducts On-Site Audit; 2,400m² Multifunctional Warehouse Project Secured
Release date:
2026-05-28
Author:
SHANDONG XINGHAO CHENGXIN INTERNATIONAL TRADE CO., LTD.
A delegation from a Malaysian manufacturing enterprise visited our production base to conduct a comprehensive factory audit. They meticulously verified aspects such as raw material traceability, welding processes, and pre-shipment inspection procedures, specifically evaluating suitability for the local tropical, high-salinity environment and compliance with customs acceptance standards.
Our technical team provided detailed 3D models, logistics and packing plans, and a full suite of qualification documents. We optimized the structural design to meet the client's dual needs for storage and processing, significantly reducing the overall construction cost. Leveraging five core advantages—including direct factory supply (eliminating middlemen), rapid delivery, and robust overseas technical support—we successfully won the bid for the 2,400m² multifunctional steel-structure warehouse project and signed a formal cooperation agreement, further solidifying our business foundation in the Southeast Asian market.
BLOGS
Get a Quote